ValueBasedProgramPerformancePeriod
This table stores performance periods for value-based programs.
| Column Name | Type | Description |
|---|---|---|
| DeprecatedProgramPeriodDeletionSourceIdentifier | NUMERIC | The program that a performance period was deleted from. |
| PerformancePeriodEndDate | DATETIME | Stores the end date for the performance period. |
| PerformancePeriodIdentifier | NUMERIC | The unique identifier (.1 item) for the performance period record. |
| PerformancePeriodExternalIdentifier | NUMERIC | Stores a unique numeric external identifier for the performance period. |
| PerformancePeriodStartDate | DATETIME | Stores the start date for the performance period. |
| ValueBasedProgramStatus | INTEGER | A status to indicate how the Caboodle engine will process the performance period. |
| ValueBasedProgramReportIdentifier | NUMERIC | The HRX report that will be used for the lived-drilldown link in VBPM dashboards. |
| PerformancePeriodDisplayName | VARCHAR | Stores the display name for the performance period. |
| CommunityLogOwnerIdentifier | VARCHAR | The Community ID (CID) of the instance from which this record or line was extracted. This is only populated if you use IntraConnect. |
| IntraConnectOwningInstanceIdentifier | VARCHAR | The Community ID (CID) of the instance that owns this record or line. This is only populated if you use IntraConnect. |
| MeasureRecalculationStopDaysAfterRunout | INTEGER | A value (in days) defining the date when the Caboodle measure calculation engine will stop recalculating measures after claims with paid dates exceeding runout period are loaded for the program |
| PerformancePeriodCreationDate | DATETIME | Stores the date the record was created |
| MeasureRecalculationDaysAfterSummary | INTEGER | A value (in days) defining the date when the Caboodle meaure calculation engine will stop recalculating measures after the summary date. |
| IntermediateClaimRunoutDays | INTEGER | A value (in days) defining the length of the intermediate runout period. The runout period is the period after a summary date in which claims may be paid and still count towards measures for the summary date. |